> ## Content Index
> Fetch the complete content index at: https://www.westernslopetrellis.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Mesa, Garfield and Montrose traffic alert, week of Nov. 23: Fourth Street stays closed, crews pause for Thanksgiving
- URL: https://www.westernslopetrellis.com/road-work-week-of-nov-23-2026/
- Published: 2026-11-20T15:59:10.000Z
- Updated: 2026-11-20T15:59:10.000Z
- Description: Fourth Street downtown stays closed with CDOT crews off Thursday and Friday for Thanksgiving, Patterson Road's single lane ends Saturday, Industrial Boulevard closes Nov. 21 to 23, First Street at Walnut runs through Nov. 30, and 6000 Road in Montrose County is closed into 2027.
- Author: Western Slope Trellis Staff
- Tags: Mesa County, Garfield County, Montrose County, #Transportation, #Mesa, #Garfield, #Montrose

*Fourth Street in downtown Grand Junction stays closed with crews off Thursday and Friday, Patterson Road's single westbound lane ends Saturday, Industrial Boulevard closes for three days, and 6000 Road in Montrose County is closed into 2027 in this rundown of road work for the weekend and the week of Nov. 23.*

Thanksgiving week is a short one on the roads. Downtown Grand Junction, Fourth Street stays closed between Ute and Pitkin avenues, and CDOT's crews work Monday, Tuesday and part of Wednesday, then stop for the holiday, per the city's traffic update. The same break applies to the 23 Road and Broadway roundabout, where Alcove Drive stays closed at 23 Road.

Patterson Road's single westbound lane at 25 Road ends Saturday, Nov. 21, Industrial Boulevard closes at 2457 Industrial Blvd. from Saturday through Monday, and First Street at Walnut Avenue stays closed through Nov. 30\. In Montrose County, 6000 Road north of Banner Road is now closed into early 2027 after October's floods wrecked its culvert. On I-70, the Beavertail Tunnel detour in De Beque Canyon has dropped off COtrip, and COtrip lists no state highway work in the three counties for Thanksgiving week beyond the downtown Grand Junction restrictions.

Everything below comes from the city, county or state agency running the job, current as of Friday morning, Nov. 20, when we also read [COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com) for state highway closures.

![Map of Mesa, Garfield and Montrose counties in western Colorado with numbered pins marking this week's road work: the Fourth Street closure, Patterson Road lane reduction, First Street and Walnut Avenue closure, Industrial Boulevard closure and 23 Road roundabout in Grand Junction, I-70 between Horizon Drive and Clifton, the Palisade roundabout, 32½ Road in Clifton, I-70 at the east end of Glenwood Canyon, 19th Street in Glenwood Springs, Whiteriver Avenue in Rifle, Shavano Valley Road, Ida Road and 6000 Road near Montrose, and the CO 348 culvert detour near Delta.](https://storage.ghost.io/c/43/83/4383b645-7c65-42d3-bda1-343eadb07cf1/content/images/2026/11/wst-road-work-map-2026-11-23.png)

Road work across Mesa, Garfield and Montrose counties this weekend and the week of Nov. 23\. Highway lines approximate.

## Grand Junction

### Downtown: Fourth Street closed, holiday pause Thursday and Friday

Fourth Street is closed between Ute and Pitkin avenues for CDOT's rebuild, with Third and Fifth streets as the alternates, per the city's [traffic update](https://www.gjcity.org/m/newsflash/Home/Detail/2330?ref=westernslopetrellis.com) for the week of Nov. 23, posted Friday. Crews work 7 a.m. to 5 p.m. Monday and Tuesday and a partial day Wednesday, with no work Thursday or Friday for Thanksgiving. Fifth Street traffic runs on the west side with one through lane each way, and vehicles over 35 feet cannot turn right from northbound Fifth onto eastbound Pitkin; the detour is Ute, Second Street and Pitkin. Ute and Pitkin stay at single lanes between Third and Sixth streets, with delays of up to 15 minutes. [COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com) lists the restrictions through Nov. 29, and CDOT's [project page](https://www.codot.gov/projects/i70bgrandjunction?ref=westernslopetrellis.com) runs the job into early 2027\. The project line is 970-880-0688.

### Four Canyons Parkway: Patterson single lane ends Saturday

Patterson Road stays at a single westbound lane at 25 Road through Saturday, Nov. 21, while crews mill and match pavement beside the new turn lane through the intersection, the city's update says; it lists no Patterson restriction after that. Four Canyons Parkway is open from F½ Road to Flat Top Lane, southbound only south of F¼ Road. Northbound traffic from Patterson must turn west onto Flat Top Lane, northbound 25 Road is closed between Flat Top Lane and F¼ Road, Foresight Circle stays closed at 25 Road, and SunPlex access is limited to Flat Top Lane while 25 Road is prepped for paving. The city's [project page](https://www.gjcity.org/1213/Four-Canyons-Parkway-Project?ref=westernslopetrellis.com) expects the turn lane, the parkway and West Foresight to be paved by the end of November.

### First Street and Walnut Avenue closed through Nov. 30

The intersection of First Street and Walnut Avenue stays closed through Nov. 30 for a stormwater and catch basin connection, a day longer than last week's notice, with the detour on Hillcrest Manor Avenue, per the city's update. Crews work Monday through Wednesday, 7 a.m. to 5 p.m., and regular work resumes Nov. 30\. Residents keep driveway access.

### Industrial Boulevard closed Saturday through Monday

Industrial Boulevard closes at 2457 Industrial Blvd. from Saturday, Nov. 21, through Monday, Nov. 23, per the city's update, with business access from 24½ Road or 25 Road. This one is new.

### 23 Road and Broadway roundabout

Alcove Drive stays closed at 23 Road, with Vista Grande Road or Columbine Drive as the way around, per the city's update. Crews work 7 a.m. to 7 p.m. Monday through Wednesday and take Thursday and Friday off.

Done: Patterson Road's westbound lane shift from Pheasant Trail Court through Beechwood Street and the CO 340 patching at the 23 Road roundabout are off the city's list this week.

## Mesa County

### I-70 Horizon Drive to Clifton: Friday only

[COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com) lists the right lane closed in both directions between 24 Road and the Palisade exit, mile points 31 to 37, from 8 a.m. to 8 p.m. Friday, Nov. 20, for paving, with a 12-foot width limit. Nothing is posted there for Thanksgiving week, though CDOT's [resurfacing page](https://www.codot.gov/projects/i70horizoncliftonresurfacing?ref=westernslopetrellis.com) runs the job through November.

### I-70 Beavertail Tunnel: off the list

The eastbound river loop detour at the Beavertail Tunnel in De Beque Canyon, which COtrip listed last week for bridge inspections with no dates, is gone from COtrip's lists as of Friday morning. CDOT has posted no release about it, so check [COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com) before you count on the tunnel.

### US 6, Palisade and county roads

US 6 east of Fruita had no closures listed Friday, though CDOT's [project page](https://www.codot.gov/projects/us6mesaresurfacing?ref=westernslopetrellis.com) runs that night job through November. In Palisade, the US 6 roundabout at Elberta Avenue is in its final phase with Rupp Avenue closed at US 6, per CDOT's [project page](https://www.codot.gov/projects/us6palisade?ref=westernslopetrellis.com), last revised in October. 32½ Road stays closed between E Road and E½ Road in Clifton until summer 2027, per [Mesa County](https://www.mesacounty.us/news/public-works/detour-during-32-12-rd-construction-begin-soon?ref=westernslopetrellis.com), and Orchard Avenue work at 31 Road runs through late December, per the [county](https://www.mesacounty.us/news/public-works/construction-underway-orchard-avenue-safety-improvements?ref=westernslopetrellis.com), which has posted no new road notices this month.

Done: the eastbound I-70 lane closures near Loma on Monday, Nov. 16, are off COtrip.

## Garfield County

### Glenwood Canyon

Westbound I-70 has its right lane closed between mile points 128.5 and 127.2, between the Dotsero and Hanging Lake exits, for cleaning operations with the speed limit cut to 40 mph, per [COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com), updated Nov. 15 with no end date posted. The Hanging Lake Tunnel has no listings for the weekend or Thanksgiving week.

Done: the fuel leak that closed westbound I-70 at mile marker 112 west of Glenwood Springs the night of Nov. 16, per [Garfield County](https://www.garfieldcounty.net/category/road-closure/?ref=westernslopetrellis.com), is over, and COtrip lists nothing there now.

### Glenwood Springs

19th Street between Grand and Blake avenues was closed into November under the city's [construction update](https://www.cogs.us/m/newsflash/Home/Detail/1001?ref=westernslopetrellis.com), unrevised since Oct. 19, and no reopening notice is posted. Use Hyland Park Drive or 20th Street if it is still closed.

### Rifle

Whiteriver Avenue has crews returning Monday, Nov. 23, to install guardrail, with flaggers and the work expected to wrap up before Thanksgiving, per the city's [Nov. 18 advisory](https://www.rifleco.org/m/newsflash/Home/Detail/628?ref=westernslopetrellis.com); hours and lane closures for next week are not posted. Questions go to the city at 970-665-6577\. Xcel's gas work keeps rotating closures on Railroad Avenue between East 10th and East 16th streets, per the [city](https://www.rifleco.org/m/newsflash/Home/Detail/614?ref=westernslopetrellis.com), and the Megan Avenue northbound lane closure from Oct. 5 still has no reopening notice.

Done: Garfield County's [road closure page](https://www.garfieldcountyco.gov/road-bridge/?ref=westernslopetrellis.com) shows no county road closures.

## Montrose County

### 6000 Road closed into 2027

6000 Road north of Banner Road will stay closed into early 2027, the county said in a [Nov. 18 notice](https://www.montrosecounty.net/m/newsflash/Home/Detail/1338?ref=westernslopetrellis.com). Heavy rain damaged the culvert's inlet and outlet until the culvert and road failed; the county has bought a bigger box culvert, expects delivery in late December and installation early next year, and plans to raise the road to improve sight distance. No detour is posted. Erika Story takes questions at 970-417-8711.

### Shavano Valley Road and Ida Road

Shavano Valley Road stays closed north of K57 Trail through Nov. 27 for a culvert replacement, per the county's [Oct. 30 notice](https://www.montrosecounty.net/m/newsflash/Home/Detail/1323?ref=westernslopetrellis.com); Mike Hindson takes questions at 970-964-2448\. Ida Road west of 6400 Road stays closed for the box culvert job that began Oct. 12, with no reopening date in the county's [Nov. 10 update](https://www.montrosecounty.net/m/newsflash/Home/Detail/1310?ref=westernslopetrellis.com).

### The West End

The county's [Nov. 2 flood notice](https://www.montrosecounty.net/m/newsflash/Home/Detail/1325?ref=westernslopetrellis.com) listed Highway 90 closed from the Utah line to mile marker 10; nothing newer is posted, and COtrip showed no CO 90 closure Friday. US 160 remains closed in two stretches near Pagosa Springs, per COtrip, so US 50 and US 550 stay CDOT's posted Denver to Durango detour; CDOT's [Nov. 18 release](https://www.codot.gov/news/2026/november2026news?ref=westernslopetrellis.com) says it is on track to reopen critical roads there ahead of Thanksgiving travel.

Done: Miami Road at 6700 Road, closed Wednesday for patching per the city's [Nov. 12 advisory](https://montroselifestyle.com/road-closure/?ref=westernslopetrellis.com), was due to reopen that afternoon.

## Delta County

### CO 348 Delta to Olathe

CO 348 has daytime work between Delta and Pea Green Cemetery Road, mile points 0.3 to 6, listed on [COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com) from 7 a.m. to 6 p.m. Friday, Monday, Nov. 23, and Tuesday, Nov. 24, with an 11-foot width limit and a 40 mph speed limit. The signed detour around the box culvert at mile point 11.5 runs south on 5400 Road to East Easter Road, per CDOT's [Nov. 6 release](https://www.codot.gov/news/2026/november2026news/delta-olathe-co348-resurfacing-begins?ref=westernslopetrellis.com). The project line is 970-576-2321.

## Looking ahead

For the week of Nov. 30, the posted items are the downtown Grand Junction restrictions, First Street and Walnut Avenue, 32½ Road, Orchard Avenue, 6000 Road, Ida Road and CO 348\. COtrip listed no state highway work in the three counties for that week as of Friday morning.

This post is built from the agency notices and COtrip listings we could find Friday morning, so it will miss short notice work and anything the agencies did not put online. For live conditions on the state highways, check [COtrip](https://www.cotrip.org/?ref=westernslopetrellis.com) or call 511 before you go.